ABC Concrete Contractors
Instant estimate · Metro Vancouver

What will your concrete cost?

Five questions. No measuring tape, no phone call. Pick the layout closest to yours and you will see a real range in about thirty seconds.

01 / Scope

What are you pouring?

02 / Size

How big is it?

Most people do not know their square footage. Pick the one that looks closest and check it against the drawing.

×
Plan view — to scale
Scaled plan of the selected area
03 / Site

What is there right now?

Tearing out an old surface is the single biggest cost after the concrete itself.

04 / Finish

How should it look?

05 / Access

Can a truck reach it?

A concrete truck needs to park within about twenty feet of the work area.

Your estimate
—
Answer the questions above

Lock in a firm price

Send us these numbers and we will come out, measure the area and give you a fixed written quote — usually within three days. No charge, no obligation.

Rather send it from your own email? Open it there instead.

06 / Send it

Book the measure

Your answers above travel with this, so we already know the size, the finish and the access before we knock on the door.

No charge and no obligation. We book the site visit within three days, and the estimate above travels with your message.

Included

Every estimate covers

  • Site layout and grade check
  • Excavation to depth
  • Compacted granular base
  • Forming and stripping
  • Rebar or wire mesh reinforcement
  • Ready-mix supply and placing
  • 32 MPa air-entrained mix on steps and garage slabs, per BC Building Code
  • Finishing and control joints
  • Curing compound
  • Haul-away and full site cleanup
Excluded

Not in the number

  • City permits and inspection fees
  • Engineered drawings, if required
  • Utility relocation
  • Unsuitable soil removal or fill import
  • Rock breaking
  • Drainage, sump or catch basin work
  • Landscaping and irrigation repair
  • Sealer beyond the first application
  • GST (5%)

This is a budget estimate based on typical Metro Vancouver conditions and the answers given above. It is not a quote and does not create a contract. Soil conditions, drainage, slope, existing structures and access can all move the final number. A firm price is issued in writing after a site visit. Prices in Canadian dollars, plus GST. Estimates are current for 30 days.